May 16, 2020

Financing trends in the construction industry

financial trends
construction
construction industry
Business
Admin
4 min
Financing trends in the construction industry
Construction financing continues to be a challenge for many contractors in the United States. Even during the pre-recession period, lending to construct...

Construction financing continues to be a challenge for many contractors in the United States. Even during the pre-recession period, lending to construction firms presented challenges to most banks. This was due to a number of economic factors, including the sensitivity of contractors to economic cycles, revenue fluctuations from year to year, excess competition and the volatility of the construction industry.

In addition to these economic factors, there are other credit underwriting issues that continue to challenge banks in lending to construction firms, including prominent construction company failures, the unpredictable nature of the work, estimates used in the preparation of financial statements, diminished gross profit margins with continued backlog profit erosion, lending against bonded accounts receivable and addressing “quasi liens” on accounts receivable secured with joint check agreements.

While the national, regional and community banks have cash to lend, many construction firms are faced with difficulty securing financing. This is especially true for contractors who need bank lines of credit to fund short-term working capital needs. Unless a construction firm has a financially sound balance sheet, consistent profitable results and a properly capitalized company, banks generally pause prior to providing financing to a construction firm. 

Construction firms that profile similar to the characteristics below continue to face issues in securing a bank relationship: 

  • Limited liquid working capital and equity
  • Significant under-billings
  • Poor ratio of accounts receivable to accounts payable
  • Significant aged progress billings and retention receivables
  • Poor credit rating and reputation for company and business owners
  • Delinquent payroll taxes, union dues and insurance premiums
  • Limited or no bonding capacity
  • Significant related party receivables

 

While the items above present underwriting issues, contractor collateral continues to present credit underwriting challenges. Most contractor collateral includes special purpose construction equipment and accounts receivable on jobs in progress and completed jobs. In the event that a bank needs to liquidate a construction firm, liquidating equipment and the collection of progress receivables that tend to evaporate in a wind-down situation are big issues. 

Additionally, banks have been struggling with allowing bonded accounts receivable to act as collateral for a line of credit. When a contractor fails to finish work on a bonded contract, the bonding company usually is entitled to collection and not the bank. Therefore, if a contractor’s business consists predominantly of bonded work, a bank line of credit needs to be underwritten as unsecured, unless additional outside collateral can be provided.

In today’s lending environment, contractors in search of financing must do everything they can to position their companies in the best possible light to bankers and potential lenders and avoid the high risk lending factors mentioned above. 

Banks will evaluate a contractor’s credit worthiness by analyzing financial and non-financial information. 

Sample financial information includes:

  • 3 years CPA prepared financial statements, reviewed or audited
  • Jobs in progress schedule, identifying bonded and non-bonded jobs
  • Accounts receivable detail, identifying bonded and non-bonded jobs
  • Accounts payable detail
  • Fixed asset appraisals on equipment and real estate in collateral pool
  • Personal financial statements of owners

 

Sample non-financial information includes:

  • Bonding company agreement and program
  • References on credit history
  • Listing of litigation in progress
  • Listing of previously completed work
  • References on job performance

 

It is critical for a construction firm to make a proper loan request as it relates to lines of credit and long-term debt. Generally, banks will evaluate lending maximums to a contractor based on a variety of factors. For lines of credit, the maximum line of credit a bank will consider a factor of 10 percent to 15 percent of annual revenue. For equipment financing, a bank will evaluate a loan request for 80 percent of the purchase price of construction equipment. This is in comparison to an equipment finance company, which will generally be able to lend 100 percent of the purchase price.

Construction companies need to keep in mind that banks are focused on requiring financial covenants to be part of the line of credit and term loan agreements. A construction company needs insure compliance with the negotiated covenants to eliminate exposure to a credit default.

Most common covenants considered by banks include: 

  • Current ratio
  • Net working capital
  • Liquidity minimum
  • Debt to equity
  • Funded debt to equity
  • Cash flow coverage

 

While lending to the construction industry continues to present underwriting challenges for banks, it is an industry in which banks do lend to frequently. It is critical that a construction company position itself in the best light and provide accurate reliable financial information to the bank during the loan request and loan monitoring periods. Banks look very favorably to companies that borrow to support growth in operations and not to finance historical losses. For construction companies, the best opportunity to obtain a loan while mitigating the risks to the bank is to providing the most accurate financial and non-financial information as part of the loan request.

 

Todd A. Feuerman is CPA, MBA, CCA, and Director at Ellin & Tucker, Chartered​

 

Follow @ConstructionGL and @NellWalkerMG

Share article

Jul 29, 2021

Environment Agency clamps down on plastic films and wraps

Environment
construction
plastic
Recycling
Dominic Ellis
3 min
Environment Agency aware of plastic film and wrap from the construction and demolition sector being illegally exported

Businesses in the waste and construction industries must ensure they deal with waste plastic properly to stop illegal exports, the Environment Agency (EA) has warned. 

The warning comes as the Agency is increasingly aware of plastic film and wrap from the construction and demolition sector being illegally exported. 

Exports are frequently being classified as ‘green list’ waste of low risk to the environment, but are often contaminated with materials such as mud, sand, bricks and woodposing a risk to the environment and human health overseas, and undermining legitimate businesses in the UK seeking to recover such waste properly.

During the last year, the EA has intercepted shipments to prevent the illegal export of this material on numerous occasions. The Agency inspected 1,889 containers at English ports and stopped 463 being illegally exported. This, combined with regulatory intervention upstream at sites, prevented the illegal export of nearly 23,000 tonnes of waste.

Those convicted of illegally exporting waste face an unlimited fine and a two-year jail sentence. But construction firms could also face enforcement action if contaminated construction and demolition waste plastic is illegally exported.

Malcolm Lythgo, Head of Waste Regulation at the Environment Agency, said it is seeing a marked increase in the number of highly contaminated plastic film and wrap shipments from the construction and demolition industry being stopped by officers.

“I would strongly urge businesses to observe their legal responsibility to ensure waste is processed appropriately, so we can protect human health and the environment now and for future generations. It’s not enough just to give your waste to someone else - even a registered carrier. You need to know where your waste will ultimately end up to know it’s been handled properly. We want to work constructively with those in the construction and waste sectors so they can operate compliantly, but we will not hesitate to clamp down on those who show disregard for the environment and the law.”

There are a number of simple, practical steps that businesses can take to ensure that C&D site waste is handled legally.

Construction businesses should check what’s in their waste

  • Different waste types need different treatments and so must be correctly categorised to ensure it goes to a site that is authorised to handle it safely. Businesses can also check if their waste is hazardous as different rules might apply.
  • If you are removing the waste yourself, you must be a registered waste carrier- registration can be carried out here. When a waste collector is transporting your site waste, you must check they have a waste carrier’s licence from the EA.
  • You must also check that the end destination site any waste is taken to is permitted to accept it and has the right authorisations in place. Keep a record of any waste that leaves your site by completing a waste transfer note or a consignment note for hazardous waste which record what and how much waste you have handed over and where it is going.

Waste management industry must adhere to export controls

  • Contaminated C&D waste plastic - including low-density polyethylene (LDPE) wrap and film - must be exported with prior consent from the EA as well as competent authorities in transit and destination countries.
  • Those involved in the export of such waste must ensure that it meets the requirements set under the relevant export controls, such as being almost free-from contamination; the destination sites are appropriately licensed to receive and treat the waste; and waste is correctly managed once received.

The EA will continue to actively target those who export contaminated C&D plastic waste illegally, including any accredited packaging exporters who issue Packaging Waste Export Recovery Notes (PERNs) against such material in breach of their Conditions of Accreditation.

Businesses involved in the shipment of waste are required to take all necessary steps to ensure the waste they ship is managed in an environmentally sound manner throughout its shipment and during its recycling.

Anyone with information regarding the illegal export of waste including C&D waste plastics can contact the EA’s Illegal Waste Exports team at: [email protected] or anonymously via Crimestoppers on 0800 555 111 or via their website 

Share article