May 16, 2020

Trimble are to acquire Building Data to develop BIM content

Building Data
Trimble
SysQue
Pat Bohle
Catherine Sturman
2 min
Trimble are to acquire Building Data to develop BIM content
Announced at Trimble Dimensions, the US Construction and technology company will acquire privately-heldBuilding Data, whose managed content and software...

Announced at Trimble Dimensions, the US Construction and technology company will acquire privately-held Building Data, whose managed content and software solutions enable Mechanical, Electrical and Plumbing (MEP) contractors and engineers to produce intelligent, constructible models, including manufacturing-specific content from a proprietary database of over 6 million 3D data components.

Building Data is dedicated to managing 3D component data for customers who create dimensionally accurate BIM for 3D coordination and installation. With over 6 million manufacturer specific content components, Building Data is host to the largest database of its kind.

The combination of Building Data’s experience in Building Information Modeling (BIM) content paired with Trimble's leadership in providing software and hardware solutions for building construction will empower contractors and engineers to gain efficiencies throughout the building lifecycle. The transaction is expected to close in the fourth quarter of 2016.

MEP contractors face an enormous challenge to develop and maintain the data needed to design, estimate, build and manage projects. Trimble's pricing and content services, combined with Building Data’s 3D solutions, will support the need for timely, accurate and structured information to drive key processes within design and construction.

Building Data’s managed content and its SysQue software extends the capabilities of existing 3D CAD platforms to enable MEP contractors and engineers to increase productivity by developing constructible models that enable accurate pre-fabrication and field layout.

"With the addition of Building Data, Trimble continues to reinforce its commitment to providing data and analytics solutions to the construction industry. Building Data’s strength lies in its ability to provide structured and highly accurate 3D content that will be connected to Trimble's existing product and pricing services," said Pat Bohle, General Manager of Trimble's MEP Division.

"This wealth of content will enable MEP contractors and engineers to use their models to improve estimating, detailing, fabrication, purchasing, manufacturing and installation processes."

"Building Data’s solutions are dedicated to improving the productivity of the building contractor and engineer," said Jim Reis, Chief Operating Officer of Building Data. "We are already integrated with several of Trimble's industry-leading software solutions including their fabrication software, field layout solutions and pricing services. We are excited to provide an even greater integrated office workflow for the building contractor and engineer by joining with Trimble.”

Follow @ConstructionGL

Read the November 2016 issue of Construction Global magazine

Share article

Jul 29, 2021

Environment Agency clamps down on plastic films and wraps

Environment
construction
plastic
Recycling
Dominic Ellis
3 min
Environment Agency aware of plastic film and wrap from the construction and demolition sector being illegally exported

Businesses in the waste and construction industries must ensure they deal with waste plastic properly to stop illegal exports, the Environment Agency (EA) has warned. 

The warning comes as the Agency is increasingly aware of plastic film and wrap from the construction and demolition sector being illegally exported. 

Exports are frequently being classified as ‘green list’ waste of low risk to the environment, but are often contaminated with materials such as mud, sand, bricks and woodposing a risk to the environment and human health overseas, and undermining legitimate businesses in the UK seeking to recover such waste properly.

During the last year, the EA has intercepted shipments to prevent the illegal export of this material on numerous occasions. The Agency inspected 1,889 containers at English ports and stopped 463 being illegally exported. This, combined with regulatory intervention upstream at sites, prevented the illegal export of nearly 23,000 tonnes of waste.

Those convicted of illegally exporting waste face an unlimited fine and a two-year jail sentence. But construction firms could also face enforcement action if contaminated construction and demolition waste plastic is illegally exported.

Malcolm Lythgo, Head of Waste Regulation at the Environment Agency, said it is seeing a marked increase in the number of highly contaminated plastic film and wrap shipments from the construction and demolition industry being stopped by officers.

“I would strongly urge businesses to observe their legal responsibility to ensure waste is processed appropriately, so we can protect human health and the environment now and for future generations. It’s not enough just to give your waste to someone else - even a registered carrier. You need to know where your waste will ultimately end up to know it’s been handled properly. We want to work constructively with those in the construction and waste sectors so they can operate compliantly, but we will not hesitate to clamp down on those who show disregard for the environment and the law.”

There are a number of simple, practical steps that businesses can take to ensure that C&D site waste is handled legally.

Construction businesses should check what’s in their waste

  • Different waste types need different treatments and so must be correctly categorised to ensure it goes to a site that is authorised to handle it safely. Businesses can also check if their waste is hazardous as different rules might apply.
  • If you are removing the waste yourself, you must be a registered waste carrier- registration can be carried out here. When a waste collector is transporting your site waste, you must check they have a waste carrier’s licence from the EA.
  • You must also check that the end destination site any waste is taken to is permitted to accept it and has the right authorisations in place. Keep a record of any waste that leaves your site by completing a waste transfer note or a consignment note for hazardous waste which record what and how much waste you have handed over and where it is going.

Waste management industry must adhere to export controls

  • Contaminated C&D waste plastic - including low-density polyethylene (LDPE) wrap and film - must be exported with prior consent from the EA as well as competent authorities in transit and destination countries.
  • Those involved in the export of such waste must ensure that it meets the requirements set under the relevant export controls, such as being almost free-from contamination; the destination sites are appropriately licensed to receive and treat the waste; and waste is correctly managed once received.

The EA will continue to actively target those who export contaminated C&D plastic waste illegally, including any accredited packaging exporters who issue Packaging Waste Export Recovery Notes (PERNs) against such material in breach of their Conditions of Accreditation.

Businesses involved in the shipment of waste are required to take all necessary steps to ensure the waste they ship is managed in an environmentally sound manner throughout its shipment and during its recycling.

Anyone with information regarding the illegal export of waste including C&D waste plastics can contact the EA’s Illegal Waste Exports team at: [email protected] or anonymously via Crimestoppers on 0800 555 111 or via their website 

Share article