Design & build of Doha south pumping station and regional odour control system

By STRABAG

The purpose of the DS-TPS is to lift and transfer raw sewage collected from IDRIS Main Trunk Sewer (under construction) to the existing inlet works of the Doha South Sewage Treatment Works. The DS-TPS is designed to provide ultimate pumping capacity for the average and peak flow 2951 l/s and 5903 l/s respectively. The DS-TPS will treat odour generated from upstream lateral inspector sewer and Main trunk sewer as well as the new coars screen shaft.   